Bainbridge Electrical were appointed as Principal Contractor for the electrical design, installation, and full coordination of AVK’s flagship Haydock Power Pods facility – a landmark, first-of-its-kind development in Europe.
This state-of-the-art, 140,000 sq ft manufacturing and assembly site is purpose-built to deliver next-generation modular power infrastructure for data centres at scale.
AVK’s ambition was clear – to create a high-capacity, highly flexible modular power facility capable of producing up to 100 PowerPods per year, meeting rapidly growing data centre demand.
This required:
As Principal Contractor, Bainbridge were responsible not only for delivering the electrical package, but also for leading the entire construction coordination, site safety, and delivery strategy from start to completion.
Bainbridge delivered a fully integrated, end-to-end solution, covering design, installation, commissioning, and site-wide coordination.
Principal Contractor Leadership:
A Flagship Facility Delivered
The Haydock site now stands as Europe’s first purpose-built modular power assembly facility, positioning AVK at the forefront of data centre infrastructure innovation.